F10 Requirements – Complete Guide to CDM F10 Notification

f10 requirements

Secondary Keywords: what is f10, form f10, what is a f10, what is an f10 notification, f10 form example, f10 notification example, f10 construction, f10 notification requirements, what is f10 in construction, when is an f10 required, f10 submission, what is an f10, what is an f10 in construction, f10 document, when do you need an f10, f10 health and safety, f10 notification requirement, when is f10 required, what is a f10 notification, f 10, hse f10 form, what is f10 notification, f10 notifiable project, cdm f10 requirements, cdm f10, health and safety f10, f10 cdm, f10 notice, f-10, submit f10, f10 form, f10 notification.

Introduction to F10 Requirements

Understanding f10 requirements is an important part of managing construction projects safely and meeting the legal responsibilities established under the Construction (Design and Management) Regulations 2015, commonly known as CDM 2015. In the United Kingdom, construction projects must follow specific health and safety procedures to protect workers, contractors, designers, clients and other people who may be affected by construction activities. One important administrative responsibility under these regulations is notifying the relevant enforcing authority when a construction project meets the legal notification thresholds. This notification is completed using the F10 form.

Many people working in the construction industry search for information about what is f10, when an F10 notification is necessary, who must complete the form and what information needs to be included. These questions are particularly important for commercial clients, property developers, construction managers, principal contractors and principal designers who need to understand their responsibilities before construction work begins.

The F10 notification is not simply another construction document. It is an official notification that informs the relevant enforcing authority about a construction project that meets specific legal criteria. It provides essential information about the project, its location, expected duration, estimated workforce and the people responsible for managing health and safety.

Understanding the correct f10 notification requirements can help project stakeholders avoid administrative mistakes and maintain better control over their legal responsibilities.

Although the F10 form is associated with construction health and safety, not every building project requires an F10 submission. The notification obligation depends on the expected duration and workforce of the project or the total number of person-days involved. This guide explains the meaning of F10, CDM F10 requirements, notification thresholds, submission procedures, examples and the responsibilities of different construction duty holders.

What Is F10?

The term F10 refers to the notification used to inform the relevant enforcing authority about a construction project that meets the notification requirements under CDM 2015. It is commonly called the F10 notification, F10 notice or HSE F10 form. The document provides essential information about a project before its construction phase begins.

When someone asks what is f10, the simplest explanation is that it is an official construction project notification used when a project meets the legal criteria for notification. It identifies the construction site, describes the work being undertaken and provides details about the client, principal designer and principal contractor where applicable.

The purpose of the F10 document is to make sure that the relevant authority receives information about projects that fall within the notifiable category. It helps establish an official record of the project and its main health and safety duty holders. The information can also be updated if important project details change during the construction process.

The F10 form is connected to the Construction (Design and Management) Regulations 2015. These regulations establish responsibilities for clients, designers, contractors, principal designers and principal contractors. Their main objective is to ensure that health and safety considerations are properly managed throughout the lifecycle of a construction project, from early planning and design through construction and completion.

It is also useful to understand that an F10 notification does not replace other legal documents. A construction project may require risk assessments, pre-construction information, a construction phase plan and a health and safety file depending on its circumstances and applicable CDM duties.

What Is an F10 Notification in Construction?

An F10 notification is the formal notice submitted to the relevant enforcing authority when a construction project reaches the notifiable threshold under CDM 2015. It tells the authority that a project is planned and provides information about the people and organisations responsible for its management.

When researching what is an f10 notification, it is important to distinguish between notifying a project and obtaining permission to carry out construction work. An F10 is a notification, not a planning approval, building control certificate or general licence to undertake construction activities. Submitting it does not automatically mean that the project has satisfied every health and safety obligation.

The notification provides details that help identify the project and its key duty holders. It also creates a reference record that can be accessed or amended when necessary.

The F10 notice is particularly relevant to larger construction projects involving multiple trades, substantial workforces or extended construction programmes. However, a project can also become notifiable because of its total person-day requirement, even if it does not employ more than 20 workers simultaneously.

When Is an F10 Required?

One of the most important parts of understanding f10 requirements is knowing when a project becomes legally notifiable. Under CDM 2015, a construction project must be notified if it is expected to meet either of the following conditions:

  1. The construction work is scheduled to last longer than 30 working days and have more than 20 workers working simultaneously at any point during the project.
  2. The construction work is expected to exceed 500 person-days.

These are two separate notification tests. A project does not need to meet both conditions. Meeting either one is sufficient to make the project notifiable.

The 30 Working Days and 20 Workers Rule

The first condition considers both the expected construction duration and the maximum number of workers working at the same time.

For example, imagine a commercial building project scheduled to run for 45 working days. If the project is expected to have 25 workers on site simultaneously during any part of the construction programme, it meets the first notification condition.

However, a project lasting 45 working days with only 15 workers working simultaneously would not meet this particular condition. It may still require notification if it exceeds 500 person-days.

It is important not to confuse the total number of people employed throughout a project with the number of people working simultaneously. The regulation focuses on how many workers are expected to work at the same time at any point during the project.

The 500 Person-Days Rule

The second condition considers the total amount of construction work measured in person-days. One person-day represents one person’s work during a normal working day. The total is calculated by adding the working days contributed by all individuals involved in the construction work.

For example, if 25 workers each work for 21 days, the project involves 525 person-days. Even if the construction programme lasts fewer than 30 working days, it exceeds the 500 person-day notification threshold.

This condition is particularly important for projects involving concentrated workforces, specialist contractors and intensive construction schedules.

A project does not need to have 20 workers on site simultaneously to become notifiable under this rule.

Do Weekends and Bank Holidays Count?

The calculation of working days can cause confusion when determining whether an F10 notification is necessary.

Every day on which construction work is likely to take place should be considered, even if only a short period of work is planned. This includes weekends and bank holidays when construction activities actually take place.

For example, a project may have a programme that includes Saturday construction activities. Those Saturdays should be included when assessing the expected duration. Days when no construction work is planned should not simply be counted as construction working days.

Accurate scheduling is therefore essential when reviewing the f10 notification requirement.

What Are the Main F10 Notification Requirements?

The main f10 notification requirements relate to project identification, responsible organisations, construction schedules and workforce estimates.

The information supplied must be sufficiently accurate to give the enforcing authority a clear understanding of the project.

The notification normally requires details about:

  • The construction site address and location.
  • The local authority responsible for the area.
  • A description of the construction project.
  • The name and contact information of the client.
  • The principal designer’s contact information, where applicable.
  • The principal contractor’s contact information, where applicable.
  • The planned construction phase start date.
  • The time allocated for completing the construction work.
  • The expected duration of the construction phase.
  • The estimated maximum number of people working on site.
  • The planned number of contractors.
  • Details of contractors and designers already appointed.
  • A declaration confirming the client’s awareness of its CDM responsibilities.

Project Location and Construction Description

The project location is one of the most important parts of an F10 document. The notification should identify the construction site clearly so that the relevant authority can understand where the work will take place.

The project description should explain the general nature of the construction activities. For example, it might involve building a new commercial property, renovating an office building, constructing residential apartments or carrying out substantial structural alterations.

A useful description should be clear and specific rather than relying on vague wording. It should communicate the main purpose of the project and the type of construction activities expected.

Client and Duty Holder Information

The form also requires information about the organisations and individuals responsible for the project.

The client is particularly important because the legal responsibility for notifying a notifiable commercial project normally belongs to the client.

The principal designer manages and coordinates health and safety considerations during the pre-construction phase. The principal contractor manages and coordinates health and safety during the construction phase.

Their contact details should be checked carefully before the notification is submitted.

Construction Dates and Workforce Estimates

Another important element of the F10 form is the construction programme. The information should include the expected start date and duration of the construction phase.

The estimated maximum workforce should also reflect the expected number of people working on the site at the same time.

The number of planned contractors should also be considered. Providing realistic estimates helps keep the notification consistent with the wider construction management arrangements.

Who Is Responsible for F10 Submission?

Understanding who must submit F10 is just as important as understanding when an F10 is required.

Under CDM 2015, the client has the legal responsibility for notifying a notifiable construction project. The client can arrange for another person, such as a principal designer or project manager, to complete the administrative process on its behalf. However, arranging for another person to submit the form does not automatically transfer the client’s legal responsibility.

Commercial Client Responsibilities

A commercial client is an organisation or individual commissioning construction work as part of a business activity. Examples include property developers, companies, commercial landlords and organisations commissioning building improvements.

The commercial client should establish whether the project meets the notification thresholds during the planning stage. If notification is necessary, the client should ensure that the required information is collected and submitted at the appropriate time.

The client should also make sure that suitable arrangements exist for managing health and safety throughout the project. Submitting an F10 form is only one part of these wider responsibilities.

Domestic Client Responsibilities

Domestic clients are individuals who arrange construction work on a home that they live in or intend to live in, where the work is not connected with a business undertaking.

CDM 2015 applies to domestic construction projects as well, even though the arrangements for fulfilling client duties are different.

For a notifiable domestic project, the notification must be carried out by the contractor or principal contractor where there is more than one contractor. A principal designer may also carry out the client’s duties where there is a written agreement for them to do so.

Can a Principal Designer Submit an F10?

Yes. A principal designer or another authorised person can complete the submission on behalf of the client.

However, for a commercial client, the legal notification duty remains with the client.

This distinction is important because the person completing the online form is not necessarily the person who holds the underlying legal responsibility.

What Is F10 in Construction and How Does It Support Health and Safety?

When people ask what is f10 in construction, they are usually trying to understand how the notification fits into the wider CDM health and safety framework.

The F10 notification helps establish an official record of a notifiable construction project. It identifies the site, provides information about the construction programme and names the relevant duty holders.

However, the F10 itself does not make a construction site safe. Effective health and safety management depends on planning, cooperation, supervision, risk control and communication throughout the project.

Construction activities can involve hazards such as:

  • Working at height.
  • Moving machinery.
  • Excavation work.
  • Electrical installations.
  • Hazardous substances.
  • Structural instability.
  • Vehicle movements.
  • Manual handling.
  • Falling objects.

These risks must be considered through appropriate project planning and management arrangements.

The CDM regulations require duty holders to consider health and safety from the earliest stages of a project. Designers should consider risks associated with their designs, while contractors must plan and manage their work safely.

The principal contractor has an important role in coordinating construction-phase activities where the project involves more than one contractor.

An F10 notice should therefore be viewed as part of the wider health and safety framework rather than a replacement for practical safety arrangements.

How to Submit F10: A Step-by-Step Guide

The HSE provides an online system for submitting an F10 notification. The online process allows clients or people acting on their behalf to provide the necessary project information and receive a unique notification reference.

Step 1: Confirm Whether the Project Is Notifiable

Before starting an F10 submission, assess the expected duration, maximum simultaneous workforce and total person-days.

Check whether the project will last longer than 30 working days with more than 20 workers working simultaneously or exceed 500 person-days.

If neither condition applies, the project will generally not require an F10 notification under CDM 2015.

Step 2: Collect the Required Information

Gather the project address, description, construction dates and estimated workforce details.

You should also obtain the relevant contact information for the client, principal designer and principal contractor.

Collecting this information before beginning the online form can make the process more straightforward.

Step 3: Complete the HSE F10 Form

Enter the required information into the online notification system.

Check the spelling of names, email addresses, telephone numbers and project details.

The information should reflect the actual project arrangements as accurately as possible.

Step 4: Review and Submit the Notification

Before submitting the form, review the information carefully and complete the required declaration.

The declaration confirms that the client is aware of its responsibilities under the CDM regulations.

Once the submission is completed, the HSE provides a unique serial number for accessing or editing the notification.

Step 5: Save the F10 Document

After submission, use the confirmation process to obtain a PDF copy of the F10 notification.

The document can be saved or printed for project records.

Keeping a copy makes it easier for the project team to access the notification information when required.

Step 6: Keep the Notification Updated

If significant information changes during the project, the notification should be reviewed and updated as necessary.

Changes to key duty holders, project details or the construction programme may mean that the information originally supplied is no longer accurate.

The client and project team should maintain appropriate communication to ensure the notification reflects the current project arrangements.

F10 Form Example: Understanding a Completed Notification

People searching for an f10 form example often want to see what information a completed notification contains.

Although every construction project is different, a typical F10 form follows a consistent structure covering the location, description, duty holders, workforce and construction programme.

For example, consider a fictional commercial office development with the following details:

F10 informationExample details
Project nameCommercial Office Development
Project locationManchester, United Kingdom
Project typeNew commercial building
ClientExample Property Developments Ltd
Principal designerExample Design Consultants
Principal contractorExample Construction Ltd
Planned start date1 March 2027
Expected duration45 working days
Maximum workforce25 workers
Planned contractors5
Notification statusNotifiable project

This fictional example demonstrates the type of information that may be included in an F10 submission.

Because the project is expected to last longer than 30 working days and have more than 20 workers simultaneously, it meets the first notification threshold.

The example is intended for educational purposes and is not an official completed HSE form. Actual information must be supplied according to the circumstances of the relevant project.

F10 Notification Example for a Smaller Project

Consider another project involving the renovation of a commercial building. The construction work is expected to last 20 working days, with 12 workers working simultaneously.

If the total construction work amounts to 240 person-days, the project does not meet either notification threshold.

It does not exceed 30 working days with more than 20 simultaneous workers, and it does not exceed 500 person-days.

This example demonstrates why project managers should assess both notification tests instead of relying only on the project duration.

F10 Example for a High-Workforce Project

Imagine a construction project that is expected to last 25 working days and involve 30 workers working simultaneously.

Although the project does not exceed 30 working days, it does not meet the first threshold because the duration requirement is not satisfied.

However, 30 workers working for 25 days would produce 750 person-days if everyone works a full day on each of those days.

The project therefore becomes notifiable under the 500 person-day condition.

What Is an F10 Document and Where Should It Be Kept?

An F10 document is the record of the construction project notification submitted to the relevant enforcing authority.

It contains the information provided during the submission process and can be retrieved as a PDF after the required fields and declaration have been completed.

The document is useful for maintaining project records and ensuring that relevant construction stakeholders can access the notification information.

The project team should retain the notification alongside other important health and safety documentation. These records may include pre-construction information, the construction phase plan, risk assessments, method statements and other relevant project documents.

A copy of the notification should be made available at the construction site in accordance with the applicable CDM requirements.

The principal contractor is responsible for ensuring that the notification is displayed in a suitable location where it can be read by people working on the project. On a project involving only one contractor, the contractor carries out the relevant construction-phase responsibilities.

Maintaining an accessible F10 document can help workers and project stakeholders understand the project’s official notification status.

What Happens If an F10 Notification Is Not Submitted?

Failing to meet the F10 notification requirements can create legal and administrative problems for the responsible client.

Where a project meets the statutory notification threshold, the client must ensure that the required notification is provided to the relevant enforcing authority.

A failure to comply with CDM obligations can expose responsible duty holders to enforcement action. The consequences depend on the circumstances, the nature of the breach and the applicable legal provisions.

It is also important to understand that submitting an F10 notification does not remove the need to comply with other CDM responsibilities.

For example, a construction project might have an accurate notification but lack suitable risk assessments, an adequate construction phase plan or effective coordination between contractors.

Clients should therefore treat notification as one element of a complete compliance process.

Does Every Construction Project Need an F10?

No. Not every construction project requires an F10 notification.

CDM 2015 applies to construction work generally, but the F10 notification obligation only applies when a project meets one or both of the statutory notification thresholds.

For example, a small property renovation involving one contractor and a limited amount of work may not require notification. Nevertheless, the contractor still has responsibilities for managing health and safety.

Similarly, a domestic building project may fall within CDM 2015 even when it does not meet the F10 notification criteria.

The fact that a project does not require an F10 does not mean that health and safety regulations can be ignored.

This is an important distinction for property owners, small builders and construction businesses. They should assess their wider CDM responsibilities independently of the notification decision.

What Is the Difference Between F10 Notification and a Construction Phase Plan?

The F10 notification and construction phase plan are two different documents that serve different purposes.

An F10 notification informs the relevant enforcing authority about a notifiable construction project. It contains information about the project, its location, its duty holders and its expected construction programme.

A construction phase plan, on the other hand, explains how health and safety will be managed during construction.

It covers the practical arrangements, site rules, risk management procedures, coordination and other relevant safety measures.

The construction phase plan is required for construction projects regardless of whether an F10 notification is necessary.

The main difference can be understood through their purposes:

  • F10 notification: Official notification of a notifiable project.
  • Construction phase plan: Practical arrangements for managing health and safety during construction.
  • Risk assessment: Identification and evaluation of workplace hazards and appropriate control measures.
  • Health and safety file: Relevant information about health and safety that needs to be considered during future construction, maintenance or other work.

These documents may be connected within the same project, but one cannot replace the others.

Does an F10 Notification Create Additional CDM Duties?

A common misunderstanding is that submitting an F10 automatically creates additional duty holder appointments. This is not how the current CDM 2015 framework works.

The requirement to appoint a principal designer and principal contractor is generally connected to whether a project involves more than one contractor, rather than whether it requires an F10 notification.

For a project involving only one contractor, the client does not need to appoint separate principal designer and principal contractor duty holders.

This distinction matters because some people assume that only larger notifiable projects require formal CDM management arrangements.

In reality, CDM responsibilities apply much more widely. A small project can have important legal health and safety requirements even when an F10 notification is unnecessary.

Common Mistakes to Avoid When Completing an F10 Form

Understanding the f10 notification requirements is only the first step. Completing the notification accurately is equally important.

Construction clients and project managers should avoid several common mistakes.

Incorrect Workforce Estimates

One common mistake is entering an estimated workforce that does not reflect the expected maximum number of people working simultaneously.

The workforce figure should be based on realistic project planning. It should not simply represent the total number of individuals who may work on the project throughout its entire duration.

Confusing Working Days With Calendar Days

Another mistake is calculating the project duration using calendar weeks without checking the actual days on which construction work will take place.

If work is planned during weekends or bank holidays, those days should be considered when calculating the construction working days.

Ignoring the 500 Person-Day Threshold

Some clients focus only on the 30-working-day and 20-worker condition.

However, the 500 person-day test is a separate notification condition. A project that does not meet the first threshold may still require an F10 because its total workforce contribution exceeds 500 person-days.

Entering Incorrect Duty Holder Information

Incorrect details for the client, principal designer or principal contractor can make the notification less useful and create communication problems.

Before submitting the form, the responsible person should verify the relevant names and contact information.

Forgetting to Update Project Information

Construction projects can change after their original planning stages.

A revised construction programme, significant scope changes or changes in key duty holders may affect the information held in the notification.

Project teams should review the notification when important changes occur and make appropriate amendments.

Assuming F10 Replaces Other Safety Documents

The F10 notification does not replace the construction phase plan, risk assessments or other required health and safety arrangements.

Each document has its own purpose and should be managed accordingly.

When Should You Submit F10?

The F10 notification should be submitted as soon as practicable before the construction phase begins.

Clients should not leave the notification until the project is already underway.

Early preparation allows the client to collect the necessary information, confirm the relevant duty holders and review the planned construction programme.

The notification should be based on the expected project arrangements. If the project subsequently changes in a way that affects the information provided, the notification should be reviewed and updated as appropriate.

Planning ahead is particularly important for projects with complicated construction schedules, multiple contractors and changing workforce requirements.

How to Update or Retrieve an Existing F10 Notification

Sometimes a construction project changes after an F10 has been submitted.

The client or authorised person may need to retrieve the original notification, check its details or make amendments.

The HSE online system provides options for creating, editing, withdrawing and retrieving F10 notifications.

A unique serial number is issued after a successful submission. This number can be used with the relevant email information to access the notification.

The F10 PDF can also be retrieved after submission, making it easier to maintain an updated project record.

Some situations in which a notification may need reviewing include:

  • A change in the principal contractor.
  • A change in the principal designer.
  • Significant changes to the construction project.
  • Changes to the planned construction programme.
  • Revised workforce estimates.
  • Changes to other important information originally provided.

Keeping the notification accurate helps ensure that the information available to the relevant stakeholders continues to reflect the project.

Understanding CDM F10 Requirements for Construction Businesses

Construction businesses should understand that CDM F10 requirements are part of a wider system of legal responsibilities.

The regulations apply to a broad range of construction activities, including new building work, alterations, extensions, conversions, repairs and certain maintenance activities.

Businesses should establish suitable procedures for checking whether projects are notifiable before construction begins. This assessment should consider the planned duration, workforce numbers and total person-days.

Project managers can make this process easier by incorporating notification checks into their early project planning procedures.

They should also coordinate with clients, designers and contractors to ensure that relevant information is available when required.

For construction companies working on several projects simultaneously, maintaining consistent documentation procedures can be particularly useful.

A standard internal checklist can help identify projects that may meet the F10 notification threshold.

The most effective approach is to treat F10 notification as part of the wider project management process. This helps businesses maintain better records, understand their responsibilities and support effective communication between construction stakeholders.

Frequently Asked Questions About F10 Requirements

1. What Is an F10?

An F10 is the official notification used to inform the relevant enforcing authority about a construction project that meets the notification requirements under CDM 2015. It provides information about the project location, construction work, client, duty holders, planned duration and workforce estimates.

2. When Do You Need an F10?

An F10 is required when a construction project is expected to last longer than 30 working days and have more than 20 workers working simultaneously at any point, or when the project is expected to exceed 500 person-days. Meeting either condition makes the project notifiable.

3. Who Is Responsible for Submitting an F10 Notification?

The client has the legal responsibility for notifying a commercial construction project. Someone else can complete the submission on the client’s behalf. For domestic projects, the notification responsibility is carried out by the contractor or principal contractor, or by the principal designer where there is a written agreement to undertake the client’s duties.

4. Does Every Construction Project Require an F10 Form?

No. Only projects meeting the statutory notification thresholds require an F10 notification. However, CDM 2015 applies to construction work more generally, so projects that do not require an F10 must still comply with their applicable health and safety responsibilities.

5. What Information Is Included in an F10 Form?

An F10 form includes the construction site location, project description, client details, principal designer and principal contractor details where applicable, planned start date, construction duration, estimated maximum workforce, number of contractors and the client’s declaration.

6. What Is an F10 Notification Example?

A typical f10 notification example might involve a commercial building project expected to last 45 working days with 25 workers working simultaneously. Because it exceeds 30 working days and has more than 20 workers at the same time, it meets the notification threshold.

7. Can a Principal Designer Submit F10 on Behalf of a Client?

Yes. A principal designer or another authorised person can complete the notification on behalf of a client. However, the legal responsibility for notification remains with a commercial client. Different arrangements apply to domestic clients under CDM 2015.

8. Is F10 the Same as a Construction Phase Plan?

No. An F10 is a notification to the relevant enforcing authority, whereas a construction phase plan explains how health and safety will be managed during the construction phase. Both serve different purposes, and a construction phase plan is required even when an F10 notification is not.

9. Can You Update an F10 Notification After Submission?

Yes. The online notification system allows submitted notifications to be accessed and edited. The unique serial number and relevant email information are used to retrieve the notification and make appropriate amendments.

10. Does an F10 Notification Mean a Project Is Legally Compliant?

No. An F10 notification does not automatically establish that a project meets every health and safety requirement. Clients, designers and contractors must continue fulfilling their individual CDM responsibilities throughout the project.

Conclusion: Understanding F10 Requirements for Better Construction Compliance

Understanding f10 requirements is essential for clients, contractors, designers and construction professionals involved in projects covered by the Construction (Design and Management) Regulations 2015.

The F10 notification provides the relevant enforcing authority with important information about construction projects that meet the statutory notification thresholds.